How much does a custom web application cost?
Most custom applications start from [PRICE], and MVPs from [PRICE]. The figure depends on how many user roles exist, how many systems it connects to, and how much of the logic is genuinely unique to your business. You get a fixed price after scoping, before any build begins.
How long will it take?
An MVP typically takes 4 to 8 weeks, a custom business application 6 to 12 weeks, and a SaaS platform 10 to 20 weeks to first commercial release. Timelines are set during scoping and tracked in two-week sprints, so slippage is visible early rather than at the end.
What happens if requirements change mid-project?
Small adjustments inside an agreed scope are normal and absorbed. Genuinely new features get quoted as a change with their own price and timeline, and you decide whether to add them now or after launch. Nothing gets silently added or silently dropped.
Who owns the code?
You do, entirely. The repository, the infrastructure accounts, the documentation and the deployment setup are all yours from the start, not handed over at the end. You can take the project to another developer at any point without asking me for anything.
Can you take over a project someone else started?
Yes, and it's a common request. I start with a fixed-fee audit of the existing code to establish what's salvageable and what isn't, then give you an honest recommendation. Sometimes that recommendation is to rebuild, and I'll explain why rather than quietly billing for a rescue that won't work.
What if I only have an idea, not a specification?
That's the normal starting point. The scoping call and the specification stage exist precisely to turn an idea into something buildable. You don't need to arrive with wireframes or a feature list — you need to be able to explain the problem and who has it.
Will I be able to maintain it after launch?
Yes. I build on widely-used frameworks specifically so you aren't dependent on one person, and every project ships with documentation and team training. You can keep me on a retainer or hand it to an in-house developer — both paths are supported by design.
Do you work with startups pre-funding?
Yes, though scope matters more there than anywhere else. If the budget is tight, the right move is usually a smaller MVP that tests the core assumption rather than a full build on a compressed timeline. I'll be direct on the call about whether your budget and scope actually match.