How much does digital transformation cost?
It depends entirely on scope, which is why the entry point is a fixed-fee assessment from [PRICE] rather than a quote for the whole thing. Individual phases typically run from [PRICE]. You approve each phase separately, so you're never committing to a total figure up front.
How long does it take?
The assessment takes 1 to 2 weeks. The first phase is usually 4 to 8 weeks. After that it depends on how many areas you choose to address, and you decide that phase by phase. There is no fixed programme length, because there is no fixed programme.
Isn't "digital transformation" just consultancy jargon?
Often, yes. It's been used to sell strategy documents with no working outcome. Here it means something specific: your systems get connected, your manual handoffs get automated, and you can measure the hours removed. If a deliverable can't be measured, it isn't on the proposal.
Will this disrupt our operations?
Each phase runs in parallel with the existing process until the replacement is proven on real work. Only one area changes at a time, and every phase can be rolled back. You'll know before each go-live exactly what changes, who's affected, and what the fallback is.
Do we have to replace our existing software?
Usually not. Most of the value comes from connecting what you already have rather than replacing it. Replacement is only worth discussing when a system is genuinely blocking you or can no longer be safely maintained — and even then, it's done incrementally.
What if our team resists the change?
That's a real risk and it's why the assessment involves interviewing the people doing the work. Systems fail more often from being imposed than from being badly built. Staff see each phase before it goes live and are trained while the old process is still running.
We're a small business — is this only for large companies?
No. Businesses with 20 to 50 staff often get the fastest payback, because a single integration can remove work for the whole team. The phased approach scales down as easily as it scales up — the first phase is the same size either way.
What do we actually get from the assessment?
A written document mapping how work moves through your business, the bottlenecks ranked by what they cost, a recommended fix and effort estimate for each, and a suggested sequence. It's yours to keep and act on, with me or with anyone else.